Electra Mining Africa 2026

Walk through a plant before it is built.

On the Roytec stand, visitors walked through a Tekla plant model with our MEP add-ons, at full scale, in augmented reality.

ParaMatic Projects

Electra Mining Africa ran from 7 to 11 September 2026 at the Johannesburg Expo Centre, Nasrec. ParaMatic Projects joined Roytec Global on its stand: Hall 5, Booth D08.

Roytec brought its process equipment know-how. We brought 3D scanning, digital twins and augmented reality.

What visitors saw

  • A plant modelled in Tekla Structures, with the piping and cabling done in ParaMatic Developments' MEP add-ons.
  • The model brought together in Trimble Connect.
  • The plant laid over the real world at full scale with Trimble SiteVision, so visitors could walk through it before it is built.

Roytec said the augmented reality walkthrough, including the 3D point cloud scanning, was done with ParaMatic Projects.

Want the same for your plant? See our 3D laser scanning.

ParaMatic Developments

Try ParaMatic Piping on your next project.

Register on our ParaMatic portal to start your free 30-day trial.