What we are working on.
News from both ParaMatic arms: the Trimble 0-60 Challenge, new releases for Tekla, trade shows, and posts from our old blog.
The latest from ParaMatic.
In the top 10 of the Trimble 0-60 Challenge.
From 128 applicants to the final 10. We present our live plant data link at Trimble Dimensions in Las Vegas on 10 November 2026.
ParaMatic DevelopmentsTalks with Trimble about Germany.
We met Trimble in Germany to plan taking ParaMatic MEP and Tekla Structures to German plant builders together.
ParaMatic DevelopmentsWalk through a plant before it is built.
On the Roytec stand, visitors walked through a Tekla plant model with our MEP add-ons, at full scale, in augmented reality.
ParaMatic ProjectsFrom 2022 to 2026.
Releases, videos, Trimble milestones and our talk in Las Vegas.
New Piping and Cabling release for Tekla.
Wye fittings, a live piping catalogue at no extra cost, more HDPE saddle branches, and line breakdown reports in Cabling.
ParaMatic DevelopmentsLinking live plant data to the BIM model.
Halfway through the 0-60 Challenge, here is what we are building: live data from plant equipment, inside the BIM model.
ParaMatic DevelopmentsOne of 15 finalists, from 128 applicants.
ParaMatic Developments made the final 15 of Trimble's 0-60 Challenge, with an entry that turns field data into live digital twins.
ParaMatic DevelopmentsOne model, one data set.
Piping, cabling and steel in one Tekla Structures model, to LOD 400, from design to fabrication and handover.
ParaMatic DevelopmentsTwo short videos on our MEP add-ons.
One minute on plant design and detailing in one Tekla model, and 23 seconds on LOD400+ models.
ParaMatic DevelopmentsTrimble on Tekla as a platform, featuring ParaMatic.
Trimble's article on developers who build on Tekla Structures features our piping and plant tools.
ParaMatic DevelopmentsWe sign a cooperation agreement with Trimble.
ParaMatic Developments signed as a Tekla Structures product-platform partner, at Trimble's offices in Espoo, Finland.
ParaMatic DevelopmentsTekla as an MEP platform: our talk in Las Vegas.
Marhinus du Plessis showed how to use Tekla as one platform across disciplines, at Trimble Dimensions+ 2022.
ParaMatic DevelopmentsPosts from 2019 to 2021.
Carried over in full from our old blog on projects.paramatic.com.
ParaMatic Software and Development Solutions with Tekla Structures #differentbutbetter
How we use Tekla for detailing, design and plant layout, and the add-ons we built to automate repeat design work.
ParaMatic DevelopmentsBuilding Information Modeling (BIM)
What BIM is, why a 3D model with data beats a 2D drawing, and where ParaMatic Piping fits in.
ParaMatic ProjectsHow the De Hoop Trail Path was built
Scanning the De Hoop cliff in half a day, designing once, and building with no welding on site.
ParaMatic ProjectsDigital Future
Why BIM should help engineers to engineer once, instead of fixing buildings after they are built.
ParaMatic ProjectsOld and new: where restoration deviates from replication
After the Notre Dame fire: how 3D scanning helps fit new ideas to old buildings.
ParaMatic ProjectsIndustry 4.0
How are we preparing to surf the wave that is Industry 4.0? A 2019 view on machines, data and jobs.
ParaMatic ProjectsWatch the work.
Six videos from our YouTube channel. Press play to watch them here.
Try ParaMatic Piping on your next project.
Register on our ParaMatic portal to start your free 30-day trial.